top of page
Anchor 1

Odo goes to Fretwater Boatworks

Life got busy again and I worked sporadically on the remaining ledgers and framing for the next few months. Then, in January I had the great opportunity to work with the awesome folks at Fretwater Boatworks, the local boat shop in Flagstaff that builds dories for commercial Grand Canyon outfitters and private boaters alike.

Brad, Cricket, Glade, and the rest of the crew at Fretwater are incredible and I'm so thankful I got the opportunity to learn from and get to know them!

january, 2022

IMG_9849.HEIC

the gunwales; steamed and learning their new shape

steaming the gunwales

IMG_9865.HEIC

The first thing we did was to get the gunwales milled, scarfed, steamed, and shaped. This was important because the gunnels can change the shape of the boat slightly, so it's important to get them clamped on or installed prior to screwing in the decking to avoid cracking. 

finishing the hatch framing

With Brad's help, the hatch framing was finished with the gutters installed and everything ready for decking.

IMG_9857.HEIC

finishing up the framing on the side hatches, the gutters show where the hatch lids will go

installing the decking & cutting the hatch lids

Learning how to cut the decking was very satisfying! There's so many little tricks that make complex cuts simple such as storyboarding, a method for mapping out points and on a curve on the boat and then translating that onto your plywood piece. 

learn more about storyboarding >

IMG_9863.HEIC

I used 3/8" ply for the deck; photo above of the center hatch decking

IMG_9862.HEIC
IMG_9865.HEIC

the front decking installed & hatch lid cut

(almost) all of the deck pieces cut

© talweg // nico francis design 2026

bottom of page